SR A1A ( Collins Avenue ) Resurfacing and Drainage from 5th Street
to Lincoln Road, Miami Beach Florida
Client:
Florida Department of Transportation
District 6
Reference:
Ivan Hay, P.E.
Resident Engineer North Dade Construction
1173 NE 205th Street
North Miami Beach, FL 33179
Phone Number (305)640-7114
Fax Number (305) 640-7145
Email Address Ivan.hay@dot.state.fl.us
Office Performed From:
Tamayo Engineering, LLC.
Alton Road Field Office
Timeframe:
2013-Present
Total Project Value:
Dollar value $7 M
Summary of Project
CEI and contract administration of the above mentioned roadway reconstruction
project along the corridor in the City of Miami Beach. This project consists of the resurfacing of a 2~lane section of SR A1A. The scope of work included asphalt resurfacing, signalization improvements, pedestrian facility improvements, lighting, drainage, landscaping, irrigation, signing and pavement markings.
Our Experience on this project is directly relevant to the West End Avenue Bridge Project in the following ways
- Dense urban environment and high volume traffic and pedestrian roadway
- Significant coordination with the FDOT in obtaining approval for various design changes affecting the construction elements
- Extensive Public Involvement coordination due to the amount of business owners throughout the corridor. Coordination was essential to achieve stakeholder consensus on various issues
- Extensive coordination with the District's Geotechnical Engineers in developing solutions to facilitate construction due to the existing soil conditions throughout the project
- Extensive coordination with the City of Miami Beach to meet the needs of the City and its residents
- Advanced utility relocations to mitigate potential delays.
- Extensive traffic modeling and observation to improve signal timing and prevent delays.
- Oversight of the complex multi stage maintenance of traffic plan
- Responded to RFI's in efficient timely manner and provided solutions
- Achieving an aesthetically final product
Relevant Project Features
- Experience with City of Miami Beach
- Complex Roadway Design
- Complex MOT Design
- Advanced Utility Coordination
- Environmental Permits
- FDOT & Local City/Agency Approvals
- Achieved Stakeholder Consensus
- Innovative Drainage Design
- Traffic Signal Improvements
- Traffic Modeling
- Traffic Control Plan
- Complex Geotech Issues
- Constructability Review
- Coordination with Adjacent Designers
- Accelerated Design Schedule
- Landscape, Lighting, & Hardscape Improvements
- Achieved Aesthetically Pleasing Design