©
2009 www.tamayoengineering.com
SR 112 (Julia Tuttle Causeway) Resurfacing
from Biscayne Waterway to Alton Road
Miami-Dade County, Florida
Client:
Florida Department of Transportation – District 6
Tamayo Engineering Role:
Construction Engineering & Inspection
Contractor:
Community Asphalt Corp.
Project Cost: $3 million
Completion Date: June 2010
Description:
This project consists of the widening and resurfacing of a 6 lane section
of SR 112. This section of roadway is a major East-West connection from the
City of Miami and the City of Miami Beach. The scope of work included asphalt
widening and resurfacing, overhead sign structures, signalization, signing
and pavement markings