© 2009 www.tamayoengineering.com
Home | About Us | Services | Qualifications | Projects | Contact Us


Perimeter Road (NW 12th Street) widening and reconstruction from NW 72nd Avenue to NW 15th Street
Miami-Dade County, Florida

Client:
Florida Department of Transportation – District 6


Tamayo Engineering Role: Quality Control Inspection


Contractors:
TransFlorida Development Corp.
Project Cost: $5 million
Completion Dates: May 2010







Description:
This project consisted of the widening and resurfacing of Perimeter Road adjacent to Miami International Airport. The scope of work included asphalt widening and resurfacing, signalization, box culvert replacement, concrete sidewalk and curb and gutter, street lighting, signing and pavement markings. Tamayo Engineering provided quality control inspection services for earthwork, concrete and asphalt operations.